Solving the Issue Of Septic Tank At Ward 4 Of Uttan
The neighboring families
of Ward no.4 Uttan were affected by the open and small septic tank which kept
on overflowing. The (Core committee members) CC members of the ward took an
initiative and had an emergency meeting with the Uncleanliness subcommittee on
2nd Dec. 2017.

On 5th Dec.
2017 two CC members and two subcommittee members took the appointment of the Nagar
Sevak and submitted the letter. After four days on 9th Dec. 2017 two
of the Nagar Sevaks visited the locality and decided to call the engineers,
show the place and build a new septic tank. This brought great relief to the
people.
Comments
Post a Comment